Back to Projects
Urban Master Planning
Al Mushref Project
The division of real estate blocks is balanced with infrastructure networks and road connections.
- Location
- Borj Chemeli - Tyre
- Area
- 100,000 m²
- Type of Study
- Residential planning and allocation
- Year
- 2015
- Client
- Public

About the Project
The division of real estate blocks is balanced with infrastructure networks and road connections.
Technical Scope of Work
Subdivision of residential blocks · Road connection · Service networks
Technical Scope of Work
- Subdivision of residential blocks
- Road connection
- Service networks
Send us the parcel boundaries, and we will return the scope and the schedule.
Every consultation request is reviewed within two working days, with the required field survey, studies and documents defined before any financial commitment.

